BMW X5 Owners & Service Manuals

BMW X5: Air Conditioning Systems

READ NEXT:

 Air Conditioner Test (R 134A)

Before A/C efficiency test, satisfy following conditions: 1. Provide a MoDiC or DIS. Safeguard electrical system integrity by checking the fault memory (no faults in the fault memory). 2. Provide a t

 Instructions For Handling Refrigerant R 134A

WARNING: Although R 134a at normal temperature is non-toxic, non-flammable and not explosive in air in any mixture ratio, it is still essential to follow various safety precautions. The filled refrig

 Leak Testing With Ultraviolet Additives (UV Additives) (BMW Leak-Testing Case)

IMPORTANT: It is absolutely essential to read and comply with the equipment manufacturer's instructions for use provided in the equipment case! Read and comply with the instructions for use provided

SEE MORE:

 Starter Lead

REMOVING AND INSTALLING OR REPLACING BATTERY POSITIVE LEAD (BETWEEN STARTER, ALTERNATOR AND BATTERY POSITIVE TERMINAL) Necessary preliminary tasks: Read out fault memory of DME control unit; if necessary, work through test schedules. Switch off ignition. Disconnect battery negative lead. Rem

 Assembly Wedges (Set In Plastic Case)

Minimum set: Mechanical tools Note: For straightening and assembly jobs on vehicle bodies, e.g. fitting trim panels, removing window weatherstrips, repairing small-scale dents, removing residual adhesive materials, measuring gap widths, levering out trim panel parts Series: E12, E21, E23, E24, E28

© 2019-2026 Copyright www.bmwx5info.com