BMW X5 Owners & Service Manuals

BMW X5: Air Conditioning Systems

READ NEXT:

 Air Conditioner Test (R 134A)

Before A/C efficiency test, satisfy following conditions: 1. Provide a MoDiC or DIS. Safeguard electrical system integrity by checking the fault memory (no faults in the fault memory). 2. Provide a t

 Instructions For Handling Refrigerant R 134A

WARNING: Although R 134a at normal temperature is non-toxic, non-flammable and not explosive in air in any mixture ratio, it is still essential to follow various safety precautions. The filled refrig

 Leak Testing With Ultraviolet Additives (UV Additives) (BMW Leak-Testing Case)

IMPORTANT: It is absolutely essential to read and comply with the equipment manufacturer's instructions for use provided in the equipment case! Read and comply with the instructions for use provided

SEE MORE:

 Replacing Rear Left Side Panel (Partial Replacement, Door Opening)

Read contents of Body, General. Spot-weld bonding is used on this vehicle. Observe specific procedure. Use only approved spot-welding apparatus for repairs! Remove or cover those vehicle components in the repair area which are susceptible to heat or dust. Following new body parts are required:

 Safety Regulations For Handling Components With Gas Generators

It is essential to comply with the regulations as specified in the law relating to the use of explosives when working on airbag units and seat belt tensioners. Airbags, seat belt tensioners etc. are pyrotechnical objects. Pyrotechnical objects are assigned to different danger classes on the basis

© 2019-2026 Copyright www.bmwx5info.com