Before A/C efficiency test, satisfy following conditions:
1. Provide a MoDiC or DIS. Safeguard electrical system integrity by checking
the fault memory (no faults
in the fault memory).
2. Provide a thermometer with separate gauge.
3. Perform the test in a suitable work bay with an ambient temperat
Principle
Displays for specific functions can be displayed
in the instrument cluster.
The following displays can be selected:
Current entertainment source, e.g., radio.
Torque and power.
G-Meter.
Trip data.
Efficiency display.
Selecting
Continue to press the button on the turn signal
lever