IMPORTANT: Read and comply with notes on protection against
electrostatic damage (ESD
protection).
IMPORTANT: Aluminum-magnesium materials.
No steel screws/bolts may be used due to the threat of ele
IMPORTANT: Read and comply with notes on protection against
electrostatic damage (ESD
protection).
Necessary preliminary tasks:
Read out fault memory of DME control unit; if necessary, work through
IMPORTANT: Read and comply with notes on protection against
electrostatic damage (ESD
protection).
Necessary preliminary tasks:
Switch off ignition
Disconnect battery negative lead.
Remove microf
Special tools required:
34 1 280.
Necessary preliminary tasks:
Remove wheels.
Remove and clean brake pads.
After completing work:
Adjusting handbrake.
Read and comply with notes on braking in new brake discs / brake pads.
Check minimum brake disc thickness:
Position special tool 34 1 2
Necessary preliminary tasks:
Remove propeller shaft.
NOTE: The propeller shaft is balanced. The front and rear propeller
shafts must be
reassembled in the same position.
Detach gaiter (1) from groove (2).
Mark front propeller shaft (3) and rear propeller shaft (4) in one plane.
Fig. 13: Identi