1. General information on handling rubber seal profiles:
If seals reveal partly detached protective film on delivery, they must
not be bonded.
Store seals at 15 ºC to 25 ºC.
If, during the han
Follow the following when
refueling
General information
Follow the fuel recommendation prior to refueling.
When refueling, insert the filler nozzle completely
into the filler pipe. Lifting up the filler nozzle during
refueling causes:
Premature switching off.
Reduced return of the fuel vapors.
SPECIAL TOOL BOARD I
Order number: 00 0 010
Special tool board I
SPECIAL TOOL BOARD II COMPLETE
In conjunction with: 00 0 230 This board can be used in a min. 4 m long
moving special tool cabinet.
Note: Size 2 m x 1 m
Series: All models
Storage location: Tool cabinet
Order number: 00 0 020
Special