BMW X5 Owners & Service Manuals

BMW X5: Crankshaft With Bearing

READ NEXT:

 Replacing Crankshaft (N52K)

Special tools required: 00 2 510 DIAL GAUGE WITH FEELER 00 9 120 TORQUE ANGLE MEASURING DIAL 11 4 370 11 4 440 11 4 470 11 9 360 IMPORTANT: Aluminium-magnesium materials. No steel screws/bolt

 Replacing All Main Crankshaft Bearing Shells(N52K)

Special tools required: 00 2 590 PLASTIGAGE (5) 11 4 251 11 4 252 11 4 470 IMPORTANT: Aluminium-magnesium materials. No steel screws/bolts may be used due to the threat of electrochemical corro

 Flywheel

REMOVING AND INSTALLING/REPLACING FLYWHEEL (N52K) Special tools required: 11 4 180 11 9 260 11 9 265 IMPORTANT: Aluminium screws/bolts must be replaced each time they are released. The end face

SEE MORE:

 Boost-Pressure Control

The boost pressure of the turbochargers is directly dependent on the flow of exhaust gas which reaches the turbocharger turbines. Both the velocity and the mass of the exhaust-gas flow are directly dependent on engine speed and engine load. The engine-management system uses wastegate valves to co

 Replacing Shaft Seal For Right Output Shaft

Special tools required: 31 4 160 Necessary preliminary tasks: Remove right output shaft. Lever shaft seal (1) out of bearing block with a screwdriver (2). Fig. 125: Identifying Shaft Seal And Screwdriver Installing shaft seal: NOTE: The installation protective ring (1) serves to protect the

© 2019-2026 Copyright www.bmwx5info.com