IMPORTANT: Danger of scalding! Only perform this work after engine has cooled down.
Necessary preliminary tasks:
Recycling
Transmission fluid emerges when oil lines are detached from heat exchanger.
Catch and dispose of escaping transmission fluid.
Observe country-specific waste-disposal regulations.
Prescribed routing of lines.
Check hoses for ease of movement with respect to ribbed V-belt.
Pay attention to routing of lines; realign retaining clamps and hoses if necessary.
Tightening torques 17 22 2AZ & 3AZ.
Add final details to vehicle.
IMPORTANT: After opening lines, check ATF level in automatic transmission.
CHECKING AND REPLACING OIL COOLER LINE (N52K)
IMPORTANT: Danger of scalding! Only perform this work after engine has cooled down.
Necessary preliminary tasks:
Recycling
Transmission fluid emerges when oil lines are detached from heat exchanger.
Catch and dispose of escaping transmission fluid.
Observe country-specific waste-disposal regulations.
Release pipe holder.
Unclip lines from holders.
Detach lines from transmission oil cooler and from transmission.
Tightening torques 17 22 2AZ & 3AZ.
Check hoses for ease of movement with respect to ribbed V-belt.
Pay attention to routing of lines; realign retaining clamps and hoses if necessary.
Add final details to vehicle.
IMPORTANT: After opening lines, check ATF level in automatic transmission, refer to Maintenance and General Information, Main Group 00.
Check ATF level in automatic transmission
KDS chassis/wheel alignment check.
Adjust toe-in on front axle.